FIELDNOTE / SPECIFICATION PRACTICE
What makes a specification
actually complete?
Completeness is not the number of filled-in fields. It is whether the next person has enough verified information to perform their part of the work.
Start with the recipient’s question.
A designer needs to protect the intended composition. A buyer needs the exact orderable item. An installer needs the relevant dimensions and requirements. Structure the record around those different needs, rather than assuming one product image serves them all.
Separate identity from application.
The manufacturer’s product facts describe the item. The project describes where it will be used and how it relates to other decisions. Keep both visible. An item suitable for one room is not automatically approved for another application.
Make missing information explicit.
“To be confirmed” is more useful than a plausible guess when the answer controls procurement or installation. Add an owner and a next question so the missing detail is a manageable task, not a hidden risk.
Close the handoff deliberately.
Check revision, approval status, outstanding items and recipients before issuing. An attractive schedule should not conceal the fact that a finish sample or installation detail is still awaiting review.